[1]
D. Ba Chin, T. . Truc Mai, D. . Quoc Huu, and N. . The Loc, “THE SOLUTION TO THE PROJECT SCHEDULING PROBLEM BY USING AN IMPROVED GENETIC ALGORITHM”, HNUEJS.NS, vol. 69, no. 3, pp. 57–66, Oct. 2024, doi: 10.18173/2354-1059.2024-0035.