Ba Chin, D., Truc Mai , T. ., Quoc Huu, D. ., & The Loc , N. . (2024). THE SOLUTION TO THE PROJECT SCHEDULING PROBLEM BY USING AN IMPROVED GENETIC ALGORITHM. Journal of Science Natural Science, 69(3), 57-66. https://doi.org/10.18173/2354-1059.2024-0035