1.
Ba Chin D, Truc Mai T, Quoc Huu D, The Loc N. THE SOLUTION TO THE PROJECT SCHEDULING PROBLEM BY USING AN IMPROVED GENETIC ALGORITHM. HNUEJS.NS. 2024;69(3):57-66. doi:10.18173/2354-1059.2024-0035