(1)
Ba Chin, D.; Truc Mai , T. .; Quoc Huu, D. .; The Loc , N. . THE SOLUTION TO THE PROJECT SCHEDULING PROBLEM BY USING AN IMPROVED GENETIC ALGORITHM. HNUEJS.NS 2024, 69 (3), 57-66. https://doi.org/10.18173/2354-1059.2024-0035.