[1]
Ba Chin, D. et al. 2024. THE SOLUTION TO THE PROJECT SCHEDULING PROBLEM BY USING AN IMPROVED GENETIC ALGORITHM. Journal of Science Natural Science. 69, 3 (Oct. 2024), 57–66. DOI:https://doi.org/10.18173/2354-1059.2024-0035.